top of page



New Inspection Chamber Installation Completed in Sutton Coldfield
At CJM Brickwork & Building Services Ltd, we’ve recently completed the installation of a new inspection chamber as part of the final stage of an extension project in Sutton Coldfield. This drainage installation was required to provide access to the existing drainage system and ensure the project met the necessary requirements before the external works could be completed. Excavation and Drainage Works The existing drainage run was located at approximately 1.7 metres below grou
Connor Mullaley
Jun 42 min read
bottom of page
